본문 내용 바로가기

언어선택

프로젝트 사례

[프로젝트사례] 상세보기
제목 Feasibility study of direct utilization of geothermal resources in pilot project areas

Context
Ethiopia has a huge geothermal potential, and various studies have been conducted in the past to understand the type and nature of those resources. However, thus far, there has been little done in terms of utilization of the resources, except a small power plant installed at Aluto Langano prospect. The main reasons for the lack of modern direct utilization are mainly related to the absence of local capacity to study the technical and financial feasibility of its use.
 

원문보기 View Original
분류 CTCN TA
Category CTCN TA
[프로젝트사례] 이전글 다음글
이전글 Identification, Characterization and exploitation of Potential Offshore Sand Banks/Deposits
다음글 The Development of Technology Needs Assessment at Subnational Level
TOP