Skip to content

Project Cases

[프로젝트사례] 상세보기
Title Feasibility study of direct utilization of geothermal resources in pilot project areas

Context
Ethiopia has a huge geothermal potential, and various studies have been conducted in the past to understand the type and nature of those resources. However, thus far, there has been little done in terms of utilization of the resources, except a small power plant installed at Aluto Langano prospect. The main reasons for the lack of modern direct utilization are mainly related to the absence of local capacity to study the technical and financial feasibility of its use.
 

View Original URL View Original
CTCN TA
Category CTCN TA
[프로젝트사례] 이전글 다음글
Prev Identification, Characterization and exploitation of Potential Offshore Sand Banks/Deposits
Next The Development of Technology Needs Assessment at Subnational Level
TOP